X
XLinkedinWhatsAppTelegramTelegram
0
Read this article in:

New rules enforced protecting animals at slaughter

The transitional period for slaughterhouses or establishments existing before January 1, 2013 to adapt their facilities to the requirements of the legislation has ended.

19 December 2019
X
XLinkedinWhatsAppTelegramTelegram
0

Regulation (EC) No 1099/2009 lays down certain conditions to be met by slaughterhouse design, construction and equipment. However, in the transitional measures of this legislation, it was stated that these requirements would apply to new slaughterhouses or new equipment, allowing a transitional period for existing slaughterhouses (before January 1, 2013) to bring their facilities into compliance with the legislation before the regulation was enforced.

This transitional period ended on December 8, 2019 and these slaughterhouses must have made the necessary adaptations to fully comply with all the requirements of Regulation (EC) No 1099/2009.

Thursday, December 12, 2019/ AECOSAN/ Spain.
http://www.aecosan.msssi.gob.es

Article Comments

This area is not intended to be a place to consult authors about their articles, but rather a place for open discussion among pig333.com users.
Leave a new Comment

Access restricted to 333 users. In order to post a comment you must be logged in.

You are not subscribed to this list pig333.com in 3 minutes

Weekly newsletter with all the pig333.com updates

Log in and sign up on the list